Practical accessibility improvements for your property.
MDM constructs accessibility improvements based on the project’s plans and professional recommendations. We coordinate the building work, required permits and inspections within an agreed scope.

Follow the route a visitor actually takes
Accessibility work often spans several connected areas, from parking and the entrance to interior circulation and restrooms. A qualified assessment helps identify the requirements for the property.
Start with the assessment
Review the qualified professional’s findings and the work identified for construction.
Coordinate connected details
Consider surfaces, thresholds, doorways, fixtures and routes within the approved scope.
Build to the documents
Complete specified improvements and coordinate required inspections.
Accessibility Improvements: what the work can include
Access routes & entries
Build specified ramps, paths, thresholds and doorway improvements where appropriate to the site.
Interior improvements
Coordinate restroom, door, fixture and other interior modifications shown in the project documents.
Plan-based construction
Work with the owner’s architect, qualified accessibility specialist and other professionals to clarify details before installation.
Plan the details before construction.
Accessibility requirements depend on the building and its use. A contractor consultation does not replace a formal accessibility assessment, CASp report or legal advice. Construction does not provide a blanket guarantee against claims or litigation.
Already have plans?
We can work with plans prepared by your own architect or engineer and provide a separate construction bid. You do not need to hire us for design to use us for construction.
A straightforward construction process
1. Review the project
Send your address, photos, approximate dimensions and available plans. We discuss the work, access and information needed to define it.
2. Agree on the scope
Clarify construction tasks, allowances, exclusions, required professional input and permit responsibilities before scheduling the work.
3. Build & review
Coordinate the agreed work and inspections, discuss changes as they arise, and review completion and applicable written warranty terms.
Your questions, answered
Can you build from my accessibility report or plans?
Yes. We can review the documents and prepare a construction bid, identifying items that require clarification or further design.
Is a formal accessibility inspection included?
Only if separately stated and arranged with the appropriate qualified professional. It is not included in a free initial project discussion.
Can improvements be phased?
Potential phasing should be reviewed with the design professional and relevant authority. We can price an agreed construction sequence.
Start with the address and a few photos.
An initial consultation is separate from engineering plans, testing and formal inspection reports. Those services are quoted separately when needed. Send your project details so we can explain the next step.
