Seismic retrofit construction, guided by the right plans.
MDM performs earthquake retrofit construction in Los Angeles based on the applicable plans and project requirements. We coordinate with qualified design professionals and can bid work from your engineer’s drawings.

The important work is often below the floor
A retrofit starts with the existing foundation and framing connections. The right scope depends on the building, access conditions and the applicable design requirements.
Review the existing structure
Gather available plans and assess access with the appropriate qualified professionals.
Follow the connection details
Complete specified bolting, connectors and framing improvements shown in the project documents.
Check before closing
Coordinate required inspections while connections remain accessible and review the completed scope.
Earthquake Retrofit: what the work can include
Existing conditions
Review accessible foundation and framing areas, available plans and the proposed scope. Engineering evaluations and formal reports are separate services.
Connections & reinforcement
Install specified anchors, connectors, bracing and other retrofit components according to the project’s approved details.
Access & inspections
Plan access, coordinate required inspections and document the work before concealed areas are closed.
Plan the details before construction.
Retrofit needs differ by building. We do not promise that construction will eliminate all earthquake damage. The scope should be based on the building, qualified evaluation and applicable requirements. Grant eligibility, funding and insurance benefits must be confirmed directly with the relevant program or insurer.
Already have plans?
We can work with plans prepared by your own architect or engineer and provide a separate construction bid. You do not need to hire us for design to use us for construction.
A straightforward construction process
1. Review the project
Send your address, photos, approximate dimensions and available plans. We discuss the work, access and information needed to define it.
2. Agree on the scope
Clarify construction tasks, allowances, exclusions, required professional input and permit responsibilities before scheduling the work.
3. Build & review
Coordinate the agreed work and inspections, discuss changes as they arise, and review completion and applicable written warranty terms.
Your questions, answered
Do you provide the structural engineering?
We coordinate with licensed professionals when needed. You may also bring your own engineer’s plans and request a construction-only bid.
Is a consultation a formal seismic inspection?
No. An initial project discussion is separate from a professional engineering evaluation, testing or written inspection report.
Can you guarantee grant funding?
No. Program rules, eligibility, availability and approval are determined by the program. Any funding must be confirmed before relying on it in your budget.
Start with the address and a few photos.
An initial consultation is separate from engineering plans, testing and formal inspection reports. Those services are quoted separately when needed. Send your project details so we can explain the next step.
